C&I Storage Investment & Development
Tailored storage solutions for factories and industrial parks, with investment shared through EMC and similar models so users capture peak-valley spread benefits at lower cost
MakeSense Energy operates an “AI-powered + distributed energy storage asset operation” business model: distributed energy storage and other asset development builds a real-time dispatchable user-side power resource network, while power services accumulate recurring operation services. Asset development is the current business foundation, and power services are the core direction of future growth. According to CIC, based on distributed energy storage asset operating scale as of December 31, 2025, we are the largest new electricity service provider in China with 799.5 MWh under operation and a 7.4% market share.
MakeSense Energy operates an “AI-powered + distributed energy storage asset operation” business model with two core segments. First, distributed energy storage and other asset development — providing commercial and industrial users with storage asset evaluation, planning, investment, development and construction services; this is the company's current business foundation. Second, power services — based on the deployed storage asset network, providing storage station O&M, peak-valley arbitrage, market-based power trading and virtual power plant aggregation services; this is the core direction of the company's future growth. Our self-developed LüDianLai platform, the Mogu Xiaomei AI agent platform and the Pre-diagnostic Safety System (PSS) provide a unified platform foundation for both segments.
Providing commercial and industrial users with storage asset evaluation, planning, investment, development and construction services; helping users deploy distributed storage systems and share peak-valley price spread benefits. Asset development is the company's current business foundation, with projects focused on the Yangtze River Delta and Pearl River Delta regions with high load and high price spreads.
Based on the deployed storage asset network, providing storage station O&M, peak-valley arbitrage, market-based power trading and virtual power plant aggregation services. The Mogu Xiaomei AI agent platform assists in forecasting electricity prices, load and generation to support charge-discharge and trading decisions. The company holds virtual power plant qualifications in Zhejiang and Jiangsu and electricity retail licences in Jiangsu, Anhui, Zhejiang and Shanghai. Power services are the core direction of the company's future growth.
By investing in and developing storage assets, the company builds a real-time dispatchable user-side power resource network, then relies on its self-developed LüDianLai platform, the Mogu Xiaomei AI agent platform and the Pre-diagnostic Safety System (PSS) to manage and operate these resources in a unified way, maximizing asset value and optimizing power costs. This “asset development + power services” dual-engine model takes the company from one-off asset development to recurring power operation services: asset development is the current business foundation, and power services are the core direction of future growth.

Asset development builds the scale foundation and power services accumulate long-term value; the Mogu Xiaomei AI agent platform assists in forecasting electricity prices, load and generation to support charge-discharge and trading decisions, making every kWh of stored power create greater value across peak-valley spreads and power markets.
MakeSense Energy's distributed energy storage asset development has a dual character of “one-off delivery + recurring service”: project delivery is a phase milestone, while every storage asset project developed adds a dispatchable power resource node to the company that continuously generates O&M, power trading and VPP aggregation service value. Asset development is the foundation for building a recurring power services network.
| Phase | Business Character |
|---|---|
| Asset development phase | Project design, equipment procurement and construction are delivered at project milestones |
| Asset operation phase | Each completed project becomes part of the company's power services network, continuously contributing peak-valley arbitrage, power trading and VPP aggregation service value |
| Network effect | As asset scale expands, the dispatchable resource pool keeps growing, and the scale effect and network value of power services continue to improve |
Tailored storage solutions for factories and industrial parks, with investment shared through EMC and similar models so users capture peak-valley spread benefits at lower cost
The Mogu Xiaomei AI agent platform assists in forecasting electricity prices, load, generation and operating conditions, ensuring safety and improving asset utilization
Leveraging electricity retail licences in Jiangsu, Anhui, Zhejiang and Shanghai to represent C&I users in provincial power market trading and optimize procurement costs
With virtual power plant qualifications in Zhejiang and Jiangsu, aggregating distributed storage assets for demand response and ancillary services to create extra value for users
The projects below cover distributed energy storage asset development and large-scale storage; all listed scales are contracted scales.
| Project | Contracted scale |
|---|---|
| Jiangsu · Kunshan (owner's annual electricity consumption about 170 million kWh; 12 containerized storage units installed; expected to save the owner several million RMB in electricity costs each year) | 63MWh |
| Anhui · Wuhu | 170MWh |
| Jiangsu · Lianyungang | 120MWh |
| Zhejiang · Jiaxing | 63.4MWh |
| Jiangsu · Suzhou | 100MWh |
| Jiangsu · Zhenjiang | 70MWh |
| Jiangsu · Huai'an | 50MWh |
| Project | Contracted scale |
|---|---|
| Inner Mongolia Autonomous Region | 2.5GWh |
| Guangxi · Chongzuo | 688MWh |
| Shandong · Dongying | 320MWh |
| Anhui · Huaibei | 206MWh |
| Jiangsu · Nanjing (China's first grid-side storage station using second-life batteries) | 268.6MWh |
| UK · Minety (the first large-scale battery storage project built by a Chinese power company in a developed country) | 99.8MWh |
The two major sectors are: ① Distributed energy storage and other asset development - providing industrial and commercial users with the evaluation, planning, investment, development, and construction of energy storage assets, forming a long-term operable asset network; ② Electricity services - including energy storage power station operation and maintenance, peak valley arbitrage, electricity market trading, and virtual power plant services, based on the established asset network, continue to generate revenue, which is the second growth curve of the company's "storage and sales synergy".
It's not disposable. The asset development forms a long-term operational energy storage asset network: the company continuously generates electricity service revenue through subsequent operations and maintenance, peak valley arbitrage, electricity market trading, and virtual power plant services. Therefore, "asset development+power services" is a dual wheel structure that is mutually undertaken, and the larger the asset size, the higher the subsequent service revenue base.
The business structure is evolving from a focus on distributed energy storage assets development to a dual focus on asset development and power services. On the one hand, the asset network continues to expand, with the operating scale increasing from 36.0MWh in 2023 and 388.4MWh in 2024 to 799.5MWh as of December 31, 2025; On the other hand, with the implementation of electricity sales qualifications and virtual power plant qualifications in multiple places, the contracted trading electricity for the year 2026 as of December 31, 2025 is about 6 billion kWh, and the proportion of electricity services continues to increase. The company's operational and financial data shall be subject to official disclosure documents.
Unlike traditional equipment manufacturing or heavy asset self holding models, MakeSense Energy focuses on "light asset+platform operation" as its core: it does not build its own manufacturing production line, but instead undertakes the evaluation, development, operation, and trading operation of energy storage assets through the LüDianLai platform, Mogu XiaomeiAI agent platform, and Pre-diagnostic Safety System (PSS), playing the role of a third-party distributed energy storage assets operator to maintain low capital expenditures during asset expansion.
Typical scenarios include: industrial and commercial energy storage investment, development, and construction (high energy consumption scenarios such as parks and factories), energy storage power station operation and safety pre diagnosis, peak valley price arbitrage, electricity market trading and auxiliary services, as well as virtual power plant aggregation participation in demand response, with customers covering industrial and commercial users, parks, and ecological partners.
Electricity services are based on the established energy storage asset network, with low marginal costs and strong income stickiness. With the continuous integration of 799.5 MWh assets as of December 31, 2025, the promotion of electricity marketization reform, and the improvement of virtual power plant mechanism, the revenue from operations, trading, and aggregation has stronger compound interest growth attributes and forms a "storage and sales synergy" with asset development business.
The company's distributed energy storage assets development project (contracted scale) includes: 63 MWh in Kunshan, Jiangsu (with an annual electricity consumption of approximately 170 million kWh by the owner and the installation of 12 sets of containerized energy storage), 170 MWh in Wuhu, Anhui, 120 MWh in Lianyungang, Zhejiang, 63.4 MWh in Jiaxing, Zhejiang, 100 MWh in Suzhou, Jiangsu, 70 MWh in Zhenjiang, Jiangsu, and 50 MWh in Huai'an, Jiangsu. The above project scales are all contracted scales, and the specific situation shall be subject to the actual project.
The large-scale energy storage projects that the company has participated in (contracted scale) include: 2500MWh in Inner Mongolia Autonomous Region, 688MWh in Chongzuo, Guangxi, 320MWh in Dongying, Shandong, 206MWh in Huaibei, Anhui, 268.6MWh in Nanjing, Jiangsu (the first grid side energy storage power station to be utilized in a cascade manner in China), and 99.8MWh in Mendy, UK (the first large-scale battery energy storage project built by a Chinese power company in a developed country). The above project scales are all contracted scales, and the specific situation shall be subject to the actual project.